1105 - Campbell County Community Hospital - Pioneer Manor Skilled Nursing Facility



The Deadline for submitting a response to CMAR Request for Proposals is Extended to:

April 10, 2014; 2:00 pm MDT

PROJECT DOCUMENTS
90% Geotechnical Investigation (100% Report expected 6/11/13)
Request for Proposals and Qualifications
CMAR Agreement
General Conditions of the Design-Build Agreement
Project Description
Project Schedule (3-15-13)
Five Percent (5%) Wyoming Advantage
GI131307A New 100% Submittal 6-18-13
Alta Survey

Scroll down for More


PAGE LINKS FOR DRAWINGS:
Architectural

SPECIFICATIONS:

ADDENDUMS:

COVERS:


 

Contractors' Q & A, Updates, and Notices
From Maloney, Inc. re: Cabinets
From J. Scull Construction re: Drawings and Light Fixtures/Allowances
From Rapid Fire, Inc. re: Attic Fire Protection, Seamless Piping, Pendant Head, Garage Dry System, and Prevailing Wages
South Dakota Overhead Doors - A: The Dock Leveler is Hydraulic, not Manual
Architects Answers to Questions re: Low Voltage Systems
ARCHITECTS UPDATE RE: OVERHEAD DOORS 3-26-14
ARCHITECTS CLARIFICATION RE: FIREPROOFING
J. Scull Construction - Roofsheeting
Simon Contractors - Asphalt for Parking Areas off of Veterans Drive
Eggli Brothers - Trim Details
Versatile Carpets and Interiors - Finish Schedule? Product Schedule Listing?
ARCHITECTS UPDATE TO ELECTRICAL DESIGN 3-31-14
Precast Bollard Caps are Acceptable
Architect Clarifies the Door and Hardware Quality Level 4-2-14
NOTICE: Clarifications to Subcontractor Bidding - 5 Percent Residential Preference 4-2-14
NOTICE: ADDENDUM NO. 5 IS NOW POSTED ABOVE Re: Resident Bariatric Rooms w/ceiling mounted lifts.
J. Scull Construction - Addendum No. 5 'Base Quality Standards' 3-7-14
Eggli Brothers, Inc. - Interior Finishes Color Schedule?
Bariatric Rooms Grab Bars 4-9-14