0803 - Campbell County Memorial Hospital

Request for Information(RFI) »

Construct ground and first floor completely, shell in second floor and construct parking ramp.

Scope of Work Geotechnical Report Design Build Schedule Program & Narratives
   

Addenda:

  1. Addendum No. 1 »
  2. Addendum No. 2 - Replaces all previously issued Concept Drawings and Project Narratives and eliminates Parking Garage »
  3. Addendum No. 3 »
  4. Addendum No. 4 »
  5. Addendum No 5 »

On this page:  Project Narrative »   Concept Plan Drawings »   RFP »   Specs »   Architectural »   Civil »  

Updated Precast Drawings »   Updated Precast Drawings for Parking Ramp»   Structural »   Mechanical »   Electrical »   Plumbing »   Clarifications for Precast Concrete Work »   Updated Civil Drawings »  

____________________

The following information is a guide to Design Build Contractors for submitting a proposal for the Design and Construction of an Expansion, Parking Ramp, Helipad, Sitework and Renovation for the Campbell County Memorial Hospital (CCMH) in Gillette, Wyoming. More detail description of the Proposal Request is described under the “General Contractor Request for Proposal” tab below. A walkthrough of the existing facility was held on 1/5/09 at 2:00 pm at the Hospital. Bids are due 2/26/09 MST.

Subcontractors are welcome to e-mail their contact information to Ron@ChristensonCorporation.com. Christenson will forward subcontractor names to all General Contractors who have shown interest in the project. In order to complete precast concrete design of the parking ramp, precast concrete design, fabrication and erection has been bid. The successful precast bidder will be directed to proceed. Once a General Contractor has been selected, however, the agreement with the precaster will be assigned to the General Contractor.

The General Contractor is to include the amount for precast work in his guaranteed maximum price for the Hospital project. Two alternates are requested with the Design/Build proposal. Narratives describing these alternates are included in the following documents. All design and construction work for the hospital will be contracted with the successful Design Builder.

_____________________


Alternate No. 3 Narratives
Architectural Narrative Mechanical Narrative
Campbell County Hospital Narr - Revised 050509 Structural Narrative - Parking Garage

Top »

Project Narrative
Architectural Narrative
Mechanical Systems Narrative
Proposed Central Energy Plant Lower Level SH #1
Proposed Central Energy Plant Upper Level SH #2

Top »

Concept Plan Drawings
FP00 - Ground Level Plan
FP01 - Ground Level Plan 2
FP01A - First Level Plan
FP02 - Second Level Plan
FP02 - Second Level Plan 2
FP03 - Third Level Plan
FP04 - Fourth Level Plan
FP05 - Fifth Level Plan
FP03A - Existing 3 South & Diagnostic Support Space

Top »


Request for Proposal
Design Build Agreement General Contractor Request for Proposal General_Conditions_of_the_DBA
Architect Agreement Architect Agreement Exhibit A Signed Geotechnical Proposal
Civil Engineer Agreement Base Bid Form Sub Contractors List 2.20.09
  CCMH pre-proposal meeting notes 1.5.09  

Top »

Precast Concrete Drawings for Parking Ramp
A100 Parking Garage 1st Level Floor Plan A400 Parking Garage Elevations
A101 Parking Garage 2nd Level Floor Plan A401 Parking Garage Elevation & Typical Wall Section
A102 Parking Garage 3rd Level Floor Plan A450 Parking Garage Sections

Top »

Updated Precast Drawings

Top »

Updated Precast Drawings for Parking Ramp
G000 COVER A401 PARKING GARAGE ELEVATION AND DETAILS
G-100 DRAWING INDEX, GENERAL NOTES AND PLAN REVIEW DATA A450 PARKING GARAGE SECTIONS
A100 PARKING GARAGE FIRST LEVEL FLOOR PLAN A475 WALL SECTIONS
A101 PARKING GARAGE 2ND LEVEL FLOOR PLAN A700 STAIR PLANS AND SECTIONS
A102 PARKING GARAGE 3RD LEVEL FLOOR PLAN A702 STAIR PLANS AND DETAILS
A400 PARKING GARAGE ELEVATIONS  

Top »

Structural
S001 Structural Notes S201 Foundation Section and Details
S002 Quality Assurance Plan S202 Foundation Section and Details 2
S101 Level 1 Foundation S203 Foundation Section and Details 3
S102 Level 2 Framing Plan S204 Foundation Section and Details 4
S103 Level 3 Framing Plan S205 Foundation Wall Elevations

Top »

Mechanical
M001 HVAC Schedules M201 HVAC Details
M101 1st Floor HVAC Plan M202 HVAC Details
M102 2nd Floor HVAC Plan M301 Mechanical Controls
M103 3rd Floor HVAC Plan MS101 Mechanical Site Plan

Top »

Electrical
E000 Legend / Schedules / Details
E102 Electrical 2nd Floor Plan
E101 Electrical 1st Floor Plan
E103 Electrical 3rd Floor Plan
ES101 Electrical Site Plan
E200 Electrical One-Line and Schedules
ES102 Electrical Site Plan 2

Top »

Plumbing
P001 Plumbing Schedules
P100 Plumbing Underground First Floor Plan
P101 Plumbing 1st Floor Plan
P102 Plumbing 2nd Floor Plan
P103 3rd Floor HVAC Plan

Top »

Clarifications for Precast Concrete Work

Top »

Specifications
Section 034100 - Precast Structural Concrete

Top »

Civil Drawings
001 Survey 200 Overall Grading Plan
002 Site Work: Demolition Plan 201 Access Road Plan and Profile
100 Overall Site and Utility Plan 202 Retaining Wall Plan and Profiles
101 Water Main Plan and Profile 300 Overall Paving Plan
102 Storm Sewer Plan and Profile 400 Civil Details

Top »

Updated Civil Drawings
C100 Overall Site and Utility Plan C200 Grading Plan
C101 Water Main Plan and Profile C202 Retaining Wall Plan and Profiles
C102 Storm Sewer Plan and Profile C300 Overall Paving Plan
C201 Access Road Plan and Profile C400 Details