Contractors' Q & A, Updates, and Notices |
From Maloney, Inc. re: Cabinets |
From J. Scull Construction re: Drawings and Light Fixtures/Allowances |
From Rapid Fire, Inc. re: Attic Fire Protection, Seamless Piping, Pendant Head, Garage Dry System, and Prevailing Wages |
South Dakota Overhead Doors - A: The Dock Leveler is Hydraulic, not Manual |
Architects Answers to Questions re: Low Voltage Systems |
ARCHITECTS UPDATE RE: OVERHEAD DOORS 3-26-14 |
ARCHITECTS CLARIFICATION RE: FIREPROOFING |
J. Scull Construction - Roofsheeting |
Simon Contractors - Asphalt for Parking Areas off of Veterans Drive |
Eggli Brothers - Trim Details |
Versatile Carpets and Interiors - Finish Schedule? Product Schedule Listing? |
ARCHITECTS UPDATE TO ELECTRICAL DESIGN 3-31-14 |
Precast Bollard Caps are Acceptable |
Architect Clarifies the Door and Hardware Quality Level 4-2-14 |
NOTICE: Clarifications to Subcontractor Bidding - 5 Percent Residential Preference 4-2-14 |
NOTICE: ADDENDUM NO. 5 IS NOW POSTED ABOVE Re: Resident Bariatric Rooms w/ceiling mounted lifts. |
J. Scull Construction - Addendum No. 5 'Base Quality Standards' 3-7-14 |
Eggli Brothers, Inc. - Interior Finishes Color Schedule? |
Bariatric Rooms Grab Bars 4-9-14 |